Advertisement

Ad promo image large
  • Published Date

    May 18, 2020
    This ad was originally published on this date and may contain an offer that is no longer valid. To learn more about this business and its most recent offers, click here.

Ad Text

SANDY BOTTOM ROAD BRIDGE LANE RESTRICTIONS Sandy Bottom Bridge in Coventry will have a one-lane alternating traffic pattern starting May 18 and continuing through December of 2020. Temporary traffic signals will be in place as the Rhode Island Department of Transportation (RIDOT) replaces the bridge. Delays are expected. Travelers should seek alternate routes. RHOT dOT Department of Transportation Two Capitol Hill Providence, RI 02903 401-222-2450 Driven to get you there www.ridot.net SANDY BOTTOM ROAD BRIDGE LANE RESTRICTIONS Sandy Bottom Bridge in Coventry will have a one-lane alternating traffic pattern starting May 18 and continuing through December of 2020. Temporary traffic signals will be in place as the Rhode Island Department of Transportation (RIDOT) replaces the bridge. Delays are expected. Travelers should seek alternate routes. RHOT dOT Department of Transportation Two Capitol Hill Providence, RI 02903 401-222-2450 Driven to get you there www.ridot.net